Triangle

Windsor Recreation Center

Owner:

Town of Windsor

General Contractor:

Pinkard Construction

Engineer:

The Ballard Group

Architects:

Barker Rinker Seacat Architecture

Project Duration:

12/01/2015 – 10/01/2016

This project included a renovation and multiple additions to the Town of Windsor’s Community Recreation Center. Additions included a second gymnasium, aerobics/cardio area, and a large aquatics addition with lap pool and family pool. A 180-foot long, fully enclosed flue slide starts inside the pool area, loops outside and returns inside. Second-floor additions included a weight room and office/support space. The renovation scope included locker ADA compliance and 3,400 sq. ft. of second-floor build-outs to create office and support areas.

Triangle