Triangle

Memorial Hospital North

Owner:

Memorial Hospital

General Contractor:

JE Dunn Construction

Engineer:

Cator Ruma & Associates

Architects:

Jonathan Bailey & Associates

Project Duration:

This project was a new 5 story, 85 beds, state of the art hospital in North Colorado Springs.  HPE installed the Plumbing, Medical Gasses, and Heating, Ventilating, and Air Conditioning on the project. The hospital is fed by a separate Central Utilities Plant (CUP) building, with 2- 500 HP steam boilers, 2- 500 ton water cooled chillers, and a 1425 GPM cooling tower with provisions to double its capacity in the future. The CUP also houses a large Emergency Generator (EGEN) that is capable of powering 60% of the hospital during power outages.