Triangle

Limon K-12

Owner:

Limon School District

General Contractor:

Haselden Construction

Engineer:

M.E. Group

Architects:

Klipp Architects

Project Duration:

The Limon K-12 school project was a ground up 3 Discipline (Plumbing, HVAC Piping, Sheet Metal) project for HPE. The air conditioning systems were addressed by roof top Dx cooling, HVAC heating, with energy recovery capability. The domestic Water systems were ran with Uponor Pex throughout. This project is pending a LEED Gold certification.

Triangle