Banning Lewis Ranch Preparatory Academy

Owner:

Banning Lewis Preparatory

General Contractor:

Fransen Pittman

Engineer:

DLR Group

Architects:

DLR Group

Project Duration:

04/2017 – 12/2017

The Banning Lewis Academy project involved the implementation of a standard mechanical system that is conditioned by single zone rooftop units, makeup units, ductless split systems, cabinet unit heaters and power ventilation. The plumbing system is a conventional system throughout the 80,528 square foot educational facility with an occupant load of 2,925 sq. ft.. The two-story facility is laid out with classrooms, science labs, gymnasium and cafeteria carries.